
Where have I been? Stitching. Stitching lots and lots and lots of these little half blocks, to be exact. With the chain piecing by hand method, these are going together much faster than I had anticipated. So much faster that … Continue reading
Where have I been? Stitching. Stitching lots and lots and lots of these little half blocks, to be exact. With the chain piecing by hand method, these are going together much faster than I had anticipated. So much faster that … Continue reading
You’ve seen these before. But it has been a very long time. January of 2013, to be exact, was the last time I posted about these. And that was the last time any work got done on them. On the … Continue reading
When we took the picture of the stack of quilt tops waiting to be quilted, we also took some of them out to the roof garden for their outdoors photo. First up was the crib size Dresden Plate quilt. This … Continue reading
By the time New Year’s Eve rolled around, this box was empty and ready for a new project in a box. That box was empty because the final 150+ 2″ Drunkard’s Path units were all stitched. But then this box … Continue reading
One of the PIBs that I am determined to finish in 2013 is the Drunkard’s Path quilt made with the 2″ units. With that in mind, I stitched another 39 of them and now am down to needing only 154 … Continue reading
After that marathon of stitching hexagon flowers of many sizes, I needed some nice relaxing curved piecing to do so that’s what I worked on last night – and got 19 more of the little Drunkard’s Path units done. Only … Continue reading
Eight more of the 2″ Drunkard’s Path units are done. Of the 832 needed, only 211 are left to be made. They are so fast to stitch that 211 really shouldn’t take more than a week to finish off — … Continue reading
What does the V.S. stand for? Either Memories of Smudge – Very Smudge or Memories of Smudge Very Special. In the final layout, there is the V as well as lots and lots of S’s. And that’s where the idea … Continue reading
The 2″ Drunkard’s Path units are another one of the candidates for the baseball playoffs quilt. There are 57 more of them done and shown in this photo. There are only 256 left to make. They’re all in this box, … Continue reading
Over the past week or so, I’ve been stitching these. In the space of about an hour, I can stitch close to 20 of these little 2″ Drunkard’s Path units. There are 66 of them in this photo. Of the … Continue reading